The identification and analysis of making-do waste: insights from two Brazilian construction sites
Explore this paper's citation graph
- Type
- article
- Published
- 2017-06-29
- Cited by
- 30
- References
- 36
- Access
- Open access
- OpenAlex
- https://openalex.org/W2729019876
Keywords
Identification (biology), Improvisation, Task (project management), Computer science, Construction waste
References
- Bricolage in Organizations
- Managing the risks of organizational accidents
- Making-Do — the Eighth Category of Waste
- Understanding the role of “tasks anticipated” in lookahead planning through simulation
- Safety and production: an integrated planning and control model
- Organizational improvisation: what, when, how, and why
- Factory physics : foundations of manufacturing management
- Investigating the relationship between planning reliability and project performance
- Construction Waste: Quantification and Source Evaluation
- The causes and costs of defects in construction. A study of seven building projects
- Bricolage as a way of life – improvisation and irony in information systems
- Quantifying levels of wasted time in construction with meta-analysis
- The complete kit concept
- Introductory Essay : Improvisation As a Mindset for Organizational Analysis
- The role of production and teamwork practices in construction safety: a cognitive model and an empirical case study.
- Organizational Improvisation and Organizational Memory
- Development of Lean Model for House Construction Using Value Stream Mapping
- Measuring the Impact of Rework on Construction Cost Performance
- Risk management in a dynamic society: a modelling problem
- Waste identification diagrams
Cited by
- Redução de variabilidade no processo de produção da alvenaria estrutural: padrão técnico e kit completo
- Developing a taxonomy of transportation waste in construction production processes
- Urbanización de viviendas y gestión ecoeficiente de residuos de construcción en Chile: aplicación del modelo español
- Requirements in performance measurement systems of construction projects from the lean production perspective
- Achieving Excellence in Lean Implementation at Construction Companies - A Case Study From Brazil
- Exploring the links between simulation modelling and construction production planning and control: a case study on the last planner system
- Slack in Construction - Part 1: Core Concepts
- Dynamic method to identify and analyze waste by making-do in construction sites
- Análise do risco relacionado à falta de terminalidade de serviços em uma obra residencial
- Diretrizes para minimização de perdas por making-do
- How effective is the construction sector in promoting the circular economy in Brazil and France? : a waste input-output analysis
- Relations Between Preconditions, Categories and Impacts of Making-Do Wastes
- Padrões emergentes na construção civil: a padronização baseada na improvisação
- PERDAS POR MAKING-DO: UM ESTUDO DE CASO EM CANTEIROS DE OBRAS DE FORTALEZA/CE
- O desafio da gestão de riscos em canteiros e suas relações com as perdas
- Perdas por making-do na etapa de vistoria e entrega de obra
- Results of the Causes and Impacts of Making-Do Wastes in Production in Fortaleza, Ceará, Brazil
- Task planning and control in construction: revealing workers as early and late planners
- Análise do risco relacionado à falta de terminalidade de serviços em uma obra residencial
- ANÁLISE PRELIMINAR DE RISCOS DAS PERDAS POR MAKING-DO RELATIVA À SEGURANÇA DO TRABALHO EM CONSTRUTORAS GOIANAS
Related papers
- ROLE OF ORGANIZATIONAL STRUCTURE ON CONSTRUCTION WASTE MANAGEMENT AMONG KUANTAN MALAYSIAN CONSTRUCTION INDUSTRIES
- Categorization of Construction Waste
- A Review On The Construction Method In Minimising Construction Waste In Malaysia
- Attitudes towards recycling on construction sites
- The comparison of construction waste produced by conventional method against IBS: A case study in Pulau Pinang
- Construction Waste Generation Causes in Residential Project in Pune Region