An Update on Last Planner
Explore this paper's citation graph
Summary
The Last Planner system of production control has now been in use for a number of years and its inventors provide an update consisting of a description of innovations and changes, thoughts on theoretical foundations, proposals regarding work structuring, phase scheduling and reliable promising, and recommendations for further development.
- Type
- article
- Published
- 2003-01-01
- Cited by
- 228
- References
- 12
- OpenAlex
- https://openalex.org/W2271209307
- Semantic Scholar
- https://api.semanticscholar.org/CorpusID:61428577
Keywords
Planner, Scheduling (production processes), Structuring, Computer science, Operations research
References
- Toyota production system : beyond large-scale production
- Toyota Production System : Beyond Large-Scale Production
- Interaction between subcycles: one key to improved methods
- Lean project management
- SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL
- An exploration towards a production theory and its application to construction
- [기술강좌] Last Planner
- Lean construction and EPC performance improvement
Cited by
- Performance Measurement Using Location-Based Status Data
- Use of progression planning tools in developing collaborative main contractor-subcontractor relationships in Norway
- Improving Construction Workflow- The Role of Production Planning and Control
- The Relation between Lean Construction and Performance in the Korean Construction Industry
- Conceptualization of Interdependency and Coordination Between Construction Tasks
- INVESTIGATING THE RELATIONSHIP BETWEEN PLANNING RELIABILITY AND PROJECT PERFORMANCE: A CASE STUDY
- INTEGRATED PLANNING VS. LAST PLANNER SYSTEM
- Project Micro-Management: Practical Site Planning and Management of Work Flow
- Production Control Principles
- Is the Last Planner System Applicable to Design? A Case Study
- APLICAÇÃO DE UM MÉTODO SOFT DA INVESTIGAÇÃO OPERACIONAL NO DESENVOLVIMENTO DE UMA CÉLULA VIRTUAL PARA O PROCESSO DE COMPRA
- A CONTINGENCY APPROACH TO THE CO-LOCATION OF DESIGN TEAM MEMBERS
- Impactos de la implementación del sistema last planner en obras de montaje industrial en minería
- A SURVEY ON THE LAST PLANNER SYSTEM: IMPACTS AND DIFFICULTIES FOR IMPLEMENTATION IN BRAZILIAN COMPANIES
- The Lean Journey: Implementing the Last Planner ® System in Construction
- Integration of Last Planner System and Location-Based Management System
- How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration?
- Improving Onsite Scheduling: Looking Into the Limits of the Last Planner System
- Modelling project complexity at the pre construction stage
- Implementing lean: UK culture and systems change
Related papers
- THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL
- An exploration towards a production theory and its application to construction
- Application of the New Production Philosophy to Construction
- SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL
- Recursive Algorithms for Modeling Genomic Ancestral Origins in a Fixed Pedigree
- Implementing Lean Construction: Stabilizing Work Flow
- Assessing the Impacts of Implementing Lean Construction
- Case Study Research: Design and Methods
- Lean Construction: From Theory to Implementation
- Toyota Production System : Beyond Large-Scale Production