Ore body modelling and comparison of different reserve estimation techniques
Explore this paper's citation graph
Summary
The efficiency of reserve estimation using nearest neighbor and inverse distance methods were compared with the ordinary krigging method as it is known as the best linear unbiased estimation.
- Type
- dissertation
- Published
- 2014-05-12
- Cited by
- 4
- References
- 17
- OpenAlex
- https://openalex.org/W182116043
- Semantic Scholar
- https://api.semanticscholar.org/CorpusID:107283722
Keywords
Estimation, Software, Computer science, Inverse, Data mining
References
- Handbook of Applied Advanced Geostatistical Ore Reserve Estimation
- An Introduction to Applied Geostatistics: by Edward H. Isaaks and R. Mohan Srivastava, 1989, Oxford University Press, New York, 561 p., ISBN 0-19-505012-6, ISBN 0-19-505013-4 (paperback), 55.00 cloth, 35.00 paper (US)
- Determining the best search neighbourhood in reserve estimation, using geostatistical method: A case study anomaly No 12A iron deposit in central Iran
- A review of recent developments in geostatistics
- Spatial Interpolation Methods: A Review
- Geostatistical Ore Reserve Estimation
- An Introduction to Applied Geostatistics
- Three-Dimensional Model of Cangshang Gold Mine Based on Surpac
- A refinement of inverse distance weighted interpolation
- Statistics For Spatial Data
- Geostatistical Ore-reserve Estimation
Cited by
Related papers
- A Study of Analogy Based Sampling for interval based cost estimation for software project management
- Analogy-Based Software Cost Estimation and Its Improvement
- A Novel Way of Cost Estimation in SoftwareProject Development Based on ClusteringTechniques
- Post-processing for uncertainty reduction in computed 3D geological models
- Machine learning for recovery factor estimation of an oil reservoir: a tool for de-risking at a hydrocarbon asset evaluation
- An Integrated Approach to shorten wind potential assessment
- Antithetic random fields applied to mine planning under uncertainty
- A COMPUTATIONAL METHOD FOR CALCULATING UNCERTAINTY IN PROJECT NETWORKS WITH DEPENDENCIES