Modeling Causes of Cost Overrun in Large Construction Projects with Partial Least Square-SEM Approach: Contractor's Perspective
Explore this paper's citation graph
- Type
- article
- Published
- 2013-02-21
- Cited by
- 69
- References
- 44
- Access
- Open access
- OpenAlex
- https://openalex.org/W31359087
- Semantic Scholar
- https://api.semanticscholar.org/CorpusID:54697814
Keywords
Cost overrun, Construction industry, Construction management, Risk analysis (engineering), Computer science
References
- MEGAPROJECTS NEED MORE STUDY UP FRONT TO AVOID COST OVERRUNS
- Modern methods for business research
- An Evaluation of PLS Based Complex Models: the Roles of Power Analysis, Predictive Relevance and GoF Index
- Social Cognitive Theory and Individual Reactions to Computing Technology: A Longitudinal Study
- Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea
- Evaluating structural equation models with unobservable variables and measurement error.
- PLS-SEM: Indeed a Silver Bullet
- Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries
- Use of partial least squares (PLS) in strategic management research: a review of four recent studies
- A Beginner's Guide to Partial Least Squares Analysis
- Confirmatory Tetrad Analysis in PLS Path Modeling
- Using PLS-SEM technique to model construction organizations' willingness to participate in e-bidding
- The impact of contractors' management capability on cost and time performance of construction projects in Nigeria
- An investigation of the status of the Malaysian construction industry
- Empirical Analysis of the Determinants of Organizational Flexibility in the Construction Business
- Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study
- Delays and cost overruns in the construction projects in the Gaza Strip
- Modeling construction cost factors in the Klang Valley area of Malaysia
- Delays and cost increases in the construction of private residential projects in Kuwait
- Using structural equation modeling to analyze relationships among key causes of delay in construction
Cited by
- Policies to avoid cost overruns:Critical evaluation and recommendations
- Framework for effective management of the construction workforce towards enhancement of labour efficiency during the building production process in South Africa
- Explaining cost overruns in infrastructure projects: a new framework with applications to Sweden
- Initial PLS Model of Construction Waste Factors
- Analysis of Cost Overrun Factors for Small Scale Construction Projects in Malaysia Using PLS-SEM Method
- Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations
- Assessment of Contractors' Mitigating Measures for Cost Overrun of Building Projects in South-Western Nigeria
- Structural equation model to investigate the factors influencing quality performance in Indian construction projects
- Developing a PLS path model to investigate the factors influencing safety performance improvement in construction organizations
- Étude des facteurs de risques de dépassements de coûts dans les projets de construction de routes et de grands travaux au Québec
- An Assessment of the Impacts of Cost Factors Influencing Performance of Small Scale Local Government Contractors in Nigeria
- Comparison between ARIMA and DES Methods of Forecasting Population for Housing Demand in Johor
- A Review on Implication of Material Management to Project Performance
- Critical factors affecting cost performance: a case of Ethiopian public construction projects
- Major causes of construction time and cost overruns
- A Model to Estimate the Time Overrun Risk in Construction Projects
- An investigation into cost overruns for ongoing building projects in Abuja, Nigeria
- Significant contributors to cost overruns in construction projects of Cambodia
- Influential factors affecting materials management in construction projects
- Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan
Related papers
- Comparative study between contractors' and consultants' evaluation of Cost Overrun factors in building construction projects in UAE
- The impact of BIM application on construction delays and cost overrun in developing countries
- Cost overrun factors in construction industry: a case of Zimbabwe
- Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman
- Leading factors and root causes of delay and cost overrun of IT and construction projects in the retail industry in Chile
- Assessment of Cost and Time of Errors in Construction Documents on Selected Building Projects in Nigeria
- 건설사업의 효율성 증진을 위한 도면정보와 시공정보의 연계방안 ( The Method of Linking Drawing and Construction Information to Improve Efficiency of Construction Processes in the Construction Industry )